by: Leonardo Corbucci 14 Dicembre 2018 18:17

Romeoauto S.p.a .: works completed.

The works of energy requalification in Romeoauto SpA were completed within the pre-established time frame. The building matter of work was located in Ponte Felcino (Perugia).

The intervention was included in the POR FESR 2014 – 2020 Call of Umbrian Region. Energy efficiency focused on the coverage, now insulated; the installation of a photovoltaic system; the new lighting technology with LED.

The works, in addition to aiming at improving energy efficiency, also concerned the reclamation of asbestos cement.

[siteorigin_widget class=”WP_Widget_Media_Video”][/siteorigin_widget]

Recent Posts

GET THE PLANT FOR YOUR BUSINESS

Feasibility study in 48 hours

Categories