by: Leonardo Corbucci 27 Agosto 2020 20:14

Module srl: work progress – Step 2

The assembly activities of the Jinko Solar photovoltaic modules, MODULO364 photovoltaic system, began this morning.

According to the planning shared with our suppliers, the assembly of the modules on all roofs should be completed by 10 September.

In the images you are seeing we also highlight the assembly of the anchoring weights of the aluminum structures specific for flat roofs. At the beginning of the week, on the other hand, the 5 EFC domes were raised and installed on the roof of the main body of the Modulo Srl plant in Umbertide. The same will be electrically connected to the control unit of the fire-fighting system. The opening of the domes is automated. The same will act as both air exchange and smoke extraction in case of fire.

Finally, we installed a new fixed cam which, through time laps, will resume the entire installation of the system. By September we will publish the complete video of the entire installation.

In partnership with Ener2Crowd

.