by: Leonardo Corbucci 18 Settembre 2020 15:28

Dayco Europe Srl – San Bernardo D’Ivrea

Maintenance work continues as planned in the Dayco Europe Srl plant in San Bernardo d’Ivrea (TO).

The aforementioned works concerned the north wall with asbestos disposal operations on the facades and restoration of the same with sandwich tiles in line with the architectural constraints of the MAAM of Ivrea (open-air museum of modern architecture).

The works continued with the installation of the prototype of the photovoltaic module holder structure to be structurally certified. In line with them, in fact, the installation of a photovoltaic system with a power of approximately 1 Mgw is planned.

[siteorigin_widget class=”SiteOrigin_Widgets_ImageGrid_Widget”][/siteorigin_widget]

Recent Posts

GET THE PLANT FOR YOUR BUSINESS

Feasibility study in 48 hours

Categories